Plot: Work begins on the exterior of the building, first by cleaning any old cracks, and then by applying a flexible polyurethane caulking that is blended to match the texture of the old stucco. Master carpenter Norm Abram repairs and updates the original front doors to the house, which were recently discovered in the basement
