The Old Gotthard Tunnel Route - Driver's Eye View
Plot: The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles